Project Summary
Pillinger Controls
Pillinger Controls help companies reduce their environmental impact, save costs, and enjoy better working conditions, with their bespoke Building Energy Management Systems (BEMS) solutions.
We undertook a project at the company’s relocation to Reigate which involved:
- Installing partitioning to create a training room, boardroom, director’s office, and storeroom, this involved installing a mixture of partitioning including:
- Crittel style glazed partitioning.
- Stud dividing partitioning walls.
- Installing an acoustic baffler within the ceiling void, and acoustic air grill.
- Fitting acoustic panels to board room and reception area.
- Fitting a kitchen including plumbing.
- Flooring: Removing the existing carpet to the breakout area and tea point and replacing with polished concrete look vinyl tiles.
- Fitting blinds to the entrance area.
The work we undertook is to the high standard that our clients have come to expect from us.